SIRIM Consignment Test Malaysia: Batch Testing & ST-SIRIM Label Guide

Direct Answer

SIRIM consignment testing is batch certification for imported electrical equipment regulated by Suruhanjaya Tenaga (ST). After the goods clear customs with a valid CoA, the importer applies on SIRIM’s e-CEE system for each model in the consignment. SIRIM inspects the stock and tests samples; on a pass, it issues ST-SIRIM labels for every unit.

⚡ Fast Facts: SIRIM Consignment Testing
  • Run by: SIRIM QAS International’s consignment laboratory, for equipment regulated by Suruhanjaya Tenaga (ST).
  • Type: Batch certification, ISO certification system No. 7.
  • System: e-CEE (e-cee.sirim.my). One application per model, per consignment.
  • Who can apply: Importers registered with ST, or a consultant they appoint.
  • When: After customs clearance, before the goods are sold.
  • Typical time: About 4–6 weeks with Mindvox, depending on the case.
  • Result: ST-SIRIM labels (BATCH), fixed on each unit, not on the packaging.
  • Alternative: SIRIM’s Product Certification Scheme (PCS).

What is SIRIM consignment testing?

Key Takeaway

Consignment testing is how an importer shows that a specific batch of ST-regulated electrical equipment matches its approval. SIRIM QAS samples the batch, tests it against the standard and the full type test report, and issues one ST-SIRIM label per approved unit.

According to SIRIM QAS’s information on consignment services, the service is third-party batch certification based on ISO certification system No. 7: a batch of product is sample-tested, and control labels are issued to that batch. It covers regulated electrical equipment that ST has approved for import. Testing is to the Malaysian Standard, IEC standard or British Standard that ST specifies for the product.

This guide covers ST-regulated electrical equipment, which is what SIRIM’s e-CEE consignment service is for. Other regulators use different routes: for example, imported building materials in CIDB’s Fourth Schedule need a CIDB PPSi, and water products need SPAN registration.

Who needs consignment testing?

ST’s Guidelines for the Approval of Electrical Equipment (2024 Edition) set the rule:

  • Importers: regulated electrical equipment approved for import must pass SIRIM’s consignment test for each batch, or join SIRIM’s PCS, within the validity of the CoA. Equipment that passes carries the ST-SIRIM label.
  • Manufacturers in Malaysia: must join PCS. Consignment testing is for imports.

ST lists 34 categories of regulated electrical equipment, from plugs, sockets and lamp fittings to kettles, fans, water heaters, washing machines, adapters and chargers. Check the official ST list or our ST approval guide.

Where consignment testing fits in the import process

  1. Register the importer with ST in e-DIK for a Certificate of Registration (CoR). See our e-DIK guide.
  2. Get the Certificate of Approval (CoA) for each product on DagangNet e-Permit, with a valid type test report.
  3. Import with the CoA. The Customs (Prohibition of Imports) Order 2023 requires a CoA or an ST letter of exemption for the electrical equipment it lists.
  4. Apply for the consignment test on e-CEE, with the approved customs K1 form.
  5. Inspection, sampling and testing by SIRIM QAS.
  6. Collect and fix the ST-SIRIM labels on each unit, plus the Energy Efficiency label for products under the Minimum Energy Performance Standards.
  7. Sell. SIRIM sends the approval information to ST.

The SIRIM consignment process on e-CEE, step by step

This follows SIRIM QAS’s consignment services process flow.

  1. Open an e-CEE account. Only importers registered with ST can register. The importer appoints a management representative, who becomes the account administrator and signs SIRIM’s letter of undertaking.
  2. Submit the application on e-cee.sirim.my, with the shipping documents for the consignment.
  3. SIRIM reviews it and issues a job number, or asks for missing documents.
  4. Pay in advance after SIRIM issues the initial quotation in e-CEE.
  5. Document review and inspector assignment.
  6. Inspection at your premises. The inspector checks that the products match the application, checks the total stock of the consignment and selects samples.
  7. Send the samples to SIRIM QAS. This is the importer’s job.
  8. Testing against the standard and the full type test report. The main tests are marking, construction, critical components, and insulation and dielectric strength.
  9. Review and approval. SIRIM tells you about any discrepancies found during testing.
  10. Final quotation, payment and labels. Pay any balance and collect the labels.
  11. Fix a label on each approved unit. SIRIM updates e-CEE and sends the approval information to ST.

Documents checklist

  • Copy of the type test report
  • Commercial invoice and packing list
  • Bill of lading (or air waybill)
  • Customs K1 form approved by the Royal Malaysian Customs Department
  • For a consultant: the importer’s letter of appointment, lodged with SIRIM QAS

SIRIM QAS assesses each application against five criteria: a full type test report from a laboratory ST recognises, ST approval to import the product, a consignment declared to and approved by Customs, compliance with the standard and the type test report, and the applicant’s ability to meet the terms and conditions.

The ST-SIRIM label (BATCH)

An importer whose consignment passes buys the ST-SIRIM labels and fixes one on each unit. ST’s guidelines explain that the word BATCH on the label shows the equipment passed the batch consignment test. SIRIM QAS says the label must be fixed on the equipment itself, legibly, and cannot go on the packaging.

SIRIM QAS can suspend an applicant for misusing labels, using fake labels, misleading prints or advertising, failing a market surveillance test, breaching its terms and conditions, or leaving fees from an earlier application unpaid.

What happens if a consignment fails

Under ST’s guidelines, equipment that fails the consignment test must be sent back to the country of origin or destroyed, or ST may direct the importer to withdraw it immediately and may seize or remove it. ST also cancels the failed CoA and informs Customs, and the importer must recall any equipment already on the market. To import again, you apply for a new CoA on e-Permit with the equipment name, brand, model and type test report.

How long does consignment testing take?

SIRIM QAS does not publish a fixed turnaround for consignment testing. With Mindvox, it typically takes about 4–6 weeks, depending on the case. The time depends on how complete your documents are, when the inspection can be scheduled, how quickly the samples reach SIRIM, and the tests the product needs. The most common delays come from details: a model on the invoice that doesn’t match the CoA, an expired type test report, or a K1 form that hasn’t been approved yet.

If you don’t have ST approval yet, the CoR and CoA come first. With Mindvox, the whole ST approval typically takes 4–6 weeks after your documents are complete, including e-DIK CoR registration if needed. Lab testing, if needed, is extra.

Consignment testing or PCS: which suits your imports?

SIRIM consignment testSIRIM PCS
How it worksEach batch is inspected and sample-tested (ISO system No. 7)The product and the factory are audited, then kept under surveillance (ISO system No. 5)
Factory auditNoYes, then surveillance audits twice a year
Applies toEach model in each consignmentThe certified product while the licence is valid (one year, renewable)
SuitsOccasional, seasonal or varied importsSteady imports of the same models, and all local manufacturing
LabelST-SIRIM label (BATCH)ST-SIRIM label or SIRIM certification mark

Read our SIRIM PCS guide for the certification route. Neither route replaces the CoA at import, or the MCMC certificate if the product has Wi-Fi, Bluetooth or other radio functions.

Shipment already at the port?

Send us your documents first. Share your bill of lading or air waybill, commercial invoice, packing list and any CoR or CoA you have. We’ll first check and review your documents and tell you what is missing.

Why work with Mindvox on SIRIM consignment testing

  • End to end: we handle SIRIM consignment testing, PCS and renewals, from the e-CEE application to the labels.
  • The approvals before it, too: e-DIK registration, the ST CoA on e-Permit and CoA renewals.
  • No Malaysian company? For overseas brands, Mindvox can act as your Malaysian importer and CoR holder.
  • We check before we submit: type test report validity, model names on the invoice, CoA and labels, and the K1 form.
  • More than electrical products: MCMC, SPAN and JKR approvals as well. See our compliance services.
  • A Malaysian company you can visit, founded in 2009: MINDVOX SDN BHD, 9-3, Jalan 6/18a, Taman Mastiara, 51200 Kuala Lumpur. We are a member of MEADA (Malaysian Electrical Appliances Distributors Association).
  • Talk to a person: WhatsApp +6012-294 2213, phone 03-6242 4858 or email sales@mindvox.com.my.

Related compliance guides

Frequently Asked Questions (FAQ)

What is SIRIM consignment testing?

It is SIRIM QAS International’s batch certification for imported electrical and electronic products regulated by Suruhanjaya Tenaga (ST), based on ISO certification system No. 7. A batch is sample-tested, and if it passes, SIRIM issues ST-SIRIM labels that must be fixed on each unit in that consignment.

Who has to do SIRIM consignment testing?

Importers of regulated electrical equipment. ST’s guidelines say imported regulated equipment must pass SIRIM’s consignment test for each batch, or be covered by SIRIM’s Product Certification Scheme (PCS), within the validity of the Certificate of Approval. Equipment manufactured in Malaysia must use PCS instead.

Is consignment testing done before or after customs clearance?

After. The goods need a valid ST Certificate of Approval (or an ST letter of exemption) to be imported. The importer then applies on e-CEE with the approved customs K1 form, and SIRIM inspects the consignment at the importer’s premises and selects samples for testing.

What documents are needed for a SIRIM consignment application?

SIRIM QAS lists a copy of the type test report, the commercial invoice, the packing list, the bill of lading and the customs K1 form approved by the Royal Malaysian Customs Department. Applications are made for every model in every consignment, and fees are paid in advance.

Can a consultant apply for SIRIM consignment testing on my behalf?

Yes. Only importers registered with ST can open an e-CEE company account, but the importer can appoint a consultant by submitting a letter of appointment to SIRIM QAS. The consultant registers separately and signs SIRIM’s letter of undertaking.

What happens if a consignment fails the SIRIM test?

ST’s guidelines say equipment that fails must be sent back to the country of origin or destroyed. ST cancels the Certificate of Approval and informs Customs, and if the equipment is already on the market the importer must recall it. A new CoA is then needed before importing again.

How long does SIRIM consignment testing take?

SIRIM QAS does not publish a fixed turnaround. With Mindvox, consignment testing typically takes about 4–6 weeks, depending on the case: how complete the documents are, when the inspection can be scheduled and the tests the product needs. If the product has no ST approval yet, the CoR and CoA come first.

Need help with SIRIM consignment testing?

Send us your CoA, type test report and shipping documents. We’ll check them and tell you what is missing before SIRIM does.

Get Consignment Testing Help