SIRIM’s Product Certification Scheme (PCS) is SIRIM QAS International’s Type 5 product certification. A document evaluation, factory audit and sample testing lead to a Product Certification Licence, valid for one year and kept up by surveillance audits twice a year. ST requires PCS for regulated electrical equipment made in Malaysia; importers can use it instead of batch testing.

⚡ Fast Facts: SIRIM PCS
  • Run by: SIRIM QAS International, accredited by the Department of Standards Malaysia for product certification to ISO/IEC 17065.
  • Type of scheme: ISO system No. 5: assessment of the product plus ongoing supervision of production.
  • Standards: Malaysian Standards (MS), British (BS), European (EN), ISO, or a publicly available specification such as a JKR specification, AWWA or ASTM.
  • Licence: Product Certification Licence, valid for one year and renewed yearly.
  • Surveillance: Twice a year, announced or unannounced, plus market sampling.
  • Timeline: No fixed time; SIRIM QAS says the fastest is about two months.
  • Mandatory when: A regulator requires it, for example ST for regulated electrical equipment made in Malaysia.

What is the SIRIM Product Certification Scheme (PCS)?

Key Takeaway

PCS is third-party product certification by SIRIM QAS International. It shows that a product conforms to a named standard and is made under an effective system of testing, supervision and control. Certified products can carry the SIRIM certification mark, and regulated products also carry SIRIM labels with unique serial numbers.

SIRIM QAS describes PCS as based on system No. 5. That means certification is not a one-off test: SIRIM QAS checks the product and the factory before granting the licence, then keeps checking through surveillance. Once certified, the product and licensee are listed on SIRIM’s online database, malaysiancertified.com.my. Locally made certified products are also added to the Treasury’s list of locally manufactured goods (Senarai Bahan/Barang Buatan Tempatan) at no extra cost.

Certification is only possible where there is a standard for the product. If the product is mandatory, the regulator decides the standard; otherwise the applicant names it.

When is PCS mandatory?

SIRIM QAS’s FAQ says product certification is voluntary, but regulators make it mandatory in certain cases. It names the Energy Commission (ST), the Fire and Rescue Department Malaysia, the Malaysian Communications and Multimedia Commission (MCMC), the National Water Services Commission (SPAN) and the Road Transport Department.

For electrical equipment, ST’s Guidelines for the Approval of Electrical Equipment (2024 Edition) set two rules:

  • Manufacturers: regulated electrical equipment approved for manufacture in Malaysia must join SIRIM’s PCS and carry the ST-SIRIM label or the SIRIM certification mark.
  • Importers: regulated electrical equipment approved for import must either pass SIRIM’s consignment test for each batch or join PCS within the validity of the Certificate of Approval (CoA).

Holding ISO 9001 does not exempt you. SIRIM QAS says that if you make a product that a regulator has made mandatory, you still need product certification.

Who can apply for SIRIM PCS?

  • Local manufacturers, with the factory audit at their own plant.
  • Foreign manufacturers, with the factory audit at the overseas plant.
  • A Malaysian company acting as local agent for a product made overseas. SIRIM QAS audits the overseas factory and invoices the local company. Mindvox can act as this local agent for overseas factories.
  • Dealers and trading companies selling a product made locally by a certified manufacturer can apply for a supplementary or trading licence. If the local manufacturer is not certified, the trading company can apply for a full licence, with audits at the manufacturer’s site.

The PCS process, step by step

  1. Questionnaire: submit SIRIM QAS’s product certification questionnaire.
  2. Quotation: SIRIM QAS checks feasibility against the standard and its testing facilities, then quotes.
  3. Application: accept the quotation, pay the initial fee and submit the forms.
  4. Document evaluation.
  5. Factory audit: the quality control plan, test equipment and calibration, and record keeping.
  6. Sample selection and testing: the auditor picks samples during the audit for testing at SIRIM QAS or another accredited laboratory.
  7. Recommendation and approval: once audit findings are corrected and the tests pass, SIRIM QAS issues the Product Certification Licence after all fees are paid.
  8. Surveillance: audits twice a year, plus market sampling.
  9. Renewal: every year, subject to the terms and conditions.

How long PCS takes, and what affects it

SIRIM QAS gives no fixed processing time. It says the fastest is about two months, and lists what decides the timeframe:

  • how ready the applicant or manufacturer is to meet the certification requirements
  • how adequate the quality system at the factory is
  • how long the full test takes under the standard (SIRIM QAS gives the examples of at least 12 months for paint and 28 days for cement)
  • product performance
  • the manufacturer’s commitment to keep complying

Cost also varies with the product and the factory location; SIRIM QAS quotes after it reviews your questionnaire.

Licence validity, surveillance and renewal

ItemWhat SIRIM QAS says
Licence validityOne year from the date of approval
RenewalYearly, subject to terms and conditions
Surveillance auditsTwice a year after certification
Other checksAnnounced or unannounced surveillance, routine market sampling, and sampling after complaints

For ST-regulated equipment, keep the CoA renewed as well. A PCS licence does not replace ST’s CoA, which is renewed every 12 months on e-Permit, or the Certificate of Registration in e-DIK. See our ST approval guide and e-DIK guide.

Marks and labels under PCS

  • Product Certification Mark: for products that comply with a Malaysian, foreign or international standard.
  • Product Listing Mark: for products that comply with an industry, association or customer specification.
  • UN marking: for packaging that meets the MS 1513 series for the transport of dangerous goods.
  • ST-SIRIM label: local manufacturers and importers in PCS for ST-regulated equipment buy the ST-SIRIM label and fix one on each unit. Under the ST-SIRIM Label Licensing Programme, the SIRIM certification mark can be embossed on the product instead.

PCS vs SIRIM consignment testing

SIRIM PCSSIRIM consignment test
BasisISO system No. 5: product plus factory supervisionISO system No. 7: one batch is sample-tested
Factory auditYes, before certification, then surveillance twice a yearNo
What it coversThe certified product while the licence is validEach model in each imported consignment
Who uses itManufacturers (required by ST for local manufacture) and importers with steady volumesImporters of ST-regulated electrical equipment
When it happensBefore the licence; ongoingAfter the shipment clears customs with a valid CoA
LabelST-SIRIM label or SIRIM certification markST-SIRIM label (BATCH) on each approved unit

Neither route replaces the ST Certificate of Approval needed at import, or the MCMC certificate for products with radio functions. Read our SIRIM consignment testing guide for the batch route. Water products may also need SPAN registration.

If a product fails

During the initial factory audit, any deviation from the certification requirements is recorded as a non-conformance, and you are given time to correct it. If a product fails testing, SIRIM QAS asks you to improve it, and the improved product is sampled and tested again.

For ST-regulated equipment, ST’s guidelines say that if equipment is proven unsafe, ST can cancel the CoA, order production to stop and require the manufacturer to recall equipment already on the market.

Why work with Mindvox on SIRIM PCS

  • End to end: we handle SIRIM PCS, SIRIM consignment testing and renewals, together with the ST CoR and CoA they depend on.
  • We prepare you for the audit: the standard, product documents, test reports and model details are checked before SIRIM QAS sees them.
  • No Malaysian company? Mindvox can act as the local agent for SIRIM PCS, and as the Malaysian importer and CoR holder for ST approval.
  • One team across regulators: ST, SIRIM, MCMC, SPAN and JKR. See our compliance services.
  • A Malaysian company you can visit, founded in 2009: MINDVOX SDN BHD, 9-3, Jalan 6/18a, Taman Mastiara, 51200 Kuala Lumpur. We are a member of MEADA (Malaysian Electrical Appliances Distributors Association).
  • Talk to a person: WhatsApp +6012-294 2213, phone 03-6242 4858 or email sales@mindvox.com.my.

Related compliance guides

Frequently Asked Questions (FAQ)

How long is a SIRIM PCS licence valid?

SIRIM QAS says certification is valid for one year from the date of approval and is renewable every year, subject to its terms and conditions. In the years after certification, SIRIM QAS carries out surveillance audits twice a year, and it can also take market samples or sample a product after a complaint.

How long does it take to get SIRIM PCS certification?

SIRIM QAS gives no fixed time; it says the fastest is about two months. The time depends on how ready the manufacturer is, the quality system at the factory, how long the full test takes (for example, at least 12 months for paint and 28 days for cement under their standards), product performance and how quickly non-conformances are closed.

What does a SIRIM PCS factory audit check?

According to SIRIM QAS, the factory audit examines whether the quality control plan is adequate, whether test equipment is adequate and calibrated, and the record-keeping system. The auditor also selects samples for testing at SIRIM QAS or another accredited laboratory. Non-conformances must be corrected before the licence is issued.

Is SIRIM PCS mandatory?

Not in general. SIRIM QAS says product certification is voluntary, but regulators make it mandatory in certain cases, naming the Energy Commission (ST), the Fire and Rescue Department, MCMC, SPAN and the Road Transport Department. For example, ST requires regulated electrical equipment manufactured in Malaysia to join PCS. ISO 9001 certification does not replace PCS where it is mandatory.

Can an overseas factory get SIRIM PCS?

Yes. SIRIM QAS says a foreign manufacturer can apply, with factory audits carried out at the manufacturing site. A Malaysian company can also apply as the local agent for a product made overseas; the initial and surveillance audits still take place at the overseas factory. Mindvox can act as your local agent for SIRIM PCS.

Should an importer choose PCS or SIRIM consignment testing?

For electrical equipment regulated by ST, an importer must either pass SIRIM’s consignment test for each batch or join PCS within the validity of the Certificate of Approval. Consignment testing suits occasional or varied shipments. PCS suits steady imports of the same models, because it covers production through factory audits instead of testing every batch.

What happens if my product fails PCS testing?

SIRIM QAS says you will be asked to improve the product, and the improved product is then sampled and tested again. For ST-regulated equipment already on the market, if the product is proven unsafe ST can cancel the Certificate of Approval and require a recall.