e-DIK System Malaysia: ST Registration (CoR) and Import Guide

Direct Answer

e-DIK is Suruhanjaya Tenaga’s online system at edik.st.gov.my, where importers and manufacturers of regulated electrical equipment register for a Certificate of Registration (CoR). It is not where products are approved: once you hold a CoR, you apply for each product’s Certificate of Approval (CoA) on DagangNet’s e-Permit.

Looking for the e-DIK login? The official portal is edik.st.gov.my, run by Suruhanjaya Tenaga (ST). Existing users sign in under Log Masuk; new users click Pendaftaran Baru. Mindvox is a private compliance firm, not ST. This guide explains how e-DIK registration works, what to prepare, and what comes after it.
⚡ Fast Facts: e-DIK System (Suruhanjaya Tenaga)
  • Official portal: edik.st.gov.my, run by Suruhanjaya Tenaga (the Energy Commission).
  • What it does: registers importers and manufacturers (the CoR) and Conformity Assessment Bodies, handles CoR updates, renewals and printing, and generates QR codes for the Energy Efficiency label.
  • What it doesn’t do: product approval. The CoA is applied for on e-Permit (epermit.dagangnet.com.my), and SIRIM consignment testing on e-cee.sirim.my.
  • CoR facts: no government fee, processed within five working days when documents are complete, valid for one to five years.
  • Legal basis: regulation 97 of the Electricity Regulations 1994. At import, the Customs (Prohibition of Imports) Order 2023 requires a CoA or an ST letter of exemption.
  • Typical timeline with Mindvox: 4–6 weeks for the whole ST approval, including CoR registration, after your documents are complete. Lab testing, if needed, is extra.

What is the e-DIK system?

Key Takeaway

e-DIK is ST’s online registration system for companies that manufacture or import regulated electrical equipment in Malaysia. A successful applicant receives a Certificate of Registration (CoR) to manufacture or import. A valid CoR is required before you can apply for any product’s Certificate of Approval (CoA), which is a separate application on e-Permit.

ST’s Guidelines for the Approval of Electrical Equipment (2024 Edition) describe two online systems. You register your company on e-DIK, and once registered you apply for the CoA for each product through e-Permit, operated by DagangNet Technologies Sdn Bhd. Since 1 October 2010, CoA applications and payments have been made online through e-Permit.

Three systems are involved between registering your company and selling the product:

SystemRun byWhat you do there
e-DIK (edik.st.gov.my)Suruhanjaya TenagaRegister as an importer or manufacturer (CoR); update, renew and print the CoR; generate EE label QR codes
e-Permit (epermit.dagangnet.com.my)DagangNet Technologies, for STApply and pay for each product’s CoA, renew it, apply for a CoA for Display or a Release Letter
e-cee (e-cee.sirim.my)SIRIMAfter customs clearance, apply for the SIRIM consignment test to get ST-SIRIM labels for the batch

What can you do in e-DIK?

According to the official e-DIK user manual for applicants (version 3.0, 14 January 2026), prepared by Dagang Net for ST, you can:

  • Register as an importer or manufacturer (Perakuan Pendaftaran untuk Mengilang / Mengimport), which leads to the CoR.
  • Register as a Conformity Assessment Body (Badan Penilaian Pematuhan), for testing laboratories.
  • Resubmit a rejected application after ST asks for more information.
  • Print your CoR (Cetak Perakuan) once ST approves it.
  • Update company details or your address (Kemaskini). ST approves the change and you reprint the certificate.
  • Renew your registration (Pembaharuan). e-DIK emails a reminder two months before an importer or manufacturer CoR expires.
  • Generate QR codes for the Energy Efficiency (EE) label using the approval number (No. Kelulusan) of your approved product.

Anyone can also search ST’s Certification Listing on e-DIK, without logging in, to check whether a brand and model of electrical equipment is approved, or to look up the star rating of an energy-using product.

Who needs to register in e-DIK?

  • Importers of regulated electrical equipment. ST requires an importer to be a Malaysian company registered with the Companies Commission of Malaysia (SSM).
  • Manufacturers that make regulated electrical equipment in Malaysia. Their products must also join SIRIM’s Product Certification Scheme (PCS).
  • Overseas brands and factories. The CoR is issued to Malaysian importers and manufacturers, and ST says applicants from abroad can apply for a CoA only if they already hold a CoR. No Malaysian company yet? Mindvox can act as your Malaysian importer and CoR holder.
  • Testing laboratories register separately in e-DIK as Conformity Assessment Bodies.
  • Sellers, retailers and online sellers don’t register in e-DIK. They may only sell equipment that already has a CoA and carries the ST-SIRIM label.

Not sure whether your product is regulated? Chapter 4 of the ST guidelines lists 34 categories of regulated electrical equipment, from plugs, sockets and lamp fittings to kettles, fans, air conditioners, adapters and chargers. Check the official ST list of regulated electrical equipment or read our ST approval guide. Wireless, Wi-Fi and Bluetooth products need MCMC certification as well, and water fittings fall under SPAN.

How to register on e-DIK: step by step

These steps follow the official e-DIK user manual. The screens are in Bahasa Malaysia, so the Malay labels are shown in italics.

  1. Open edik.st.gov.my and click Pendaftaran Baru (New Registration).
  2. Create your login. Enter a user ID and click Semak to check that it is free, fill in the login details, then click Seterusnya. Fields marked with a red star are mandatory.
  3. Choose the registration type Perakuan Pendaftaran untuk Mengilang / Mengimport (Certificate of Registration to Manufacture / Import).
  4. Company information (Maklumat Syarikat): enter your company details and click Simpan.
  5. Warehouse (Gudang): enter the warehouse details and click Simpan.
  6. Applicant (Pengguna): enter the applicant’s details and click Simpan.
  7. Documents (Dokumen): click Lihat to see a sample, Lampir to choose each file and Muat Naik to upload it.
  8. Declaration (Pengakuan): tick Setuju (I Agree) and click Hantar to submit.
  9. Confirm by email. Click the Pengesahan link in the email e-DIK sends you. The application only reaches ST after you confirm.
  10. Print your CoR. When ST approves the registration, you get an email. Log in and click Cetak Perakuan.

If ST needs more information or another document, it rejects the application with a remark and emails you. Log in, update the details, and resubmit from the Pengakuan tab.

Documents required for an ST Certificate of Registration

ST lists these documents for a CoR to manufacture or import:

  • SSM registration document: SSM Business Profile (Registration of Businesses Act 1956), SSM Corporate Profile (Companies Act 2016) or SSM LLP Profile (Limited Liability Partnerships Act 2012)
  • Warehouse tenancy agreement, if the premises are rented
  • Business licence from the local authority (PBT), for example DBKL
  • Photos of the business premises and warehouse, showing the business signboard
  • Any other information or document ST asks for

CoR processing time, validity, fees and renewal

ItemWhat ST says
Processing timeFive working days, if the documents are complete
ValidityOne to five years, depending on the period you apply for
Government feeNo fee
Renewal windowOpens in e-DIK two months before expiry; renew no later than 14 days before expiry
Late renewalReceived less than 14 days before expiry: automatically rejected, and you must apply for a new CoR

Sources: ST FAQ on the Certificate of Registration and the ST Guidelines for the Approval of Electrical Equipment (2024 Edition), section 6.1.

The CoR is only the first step. With Mindvox, the whole ST approval typically takes 4–6 weeks after your documents are complete. That covers the CoR registration in e-DIK if you don’t have one yet, the DagangNet e-Permit account and the CoA application. If your product still needs testing at a laboratory, the lab’s testing time is added on top.

After e-DIK: from CoR to customs clearance and sale

  1. Get your CoR in e-DIK, as above.
  2. Open a DagangNet e-Permit account. ST asks applicants to contact Dagang Net Technologies (1-300-133-133, careline@dagangnet.com) for a user ID.
  3. Apply for the CoA for each product on e-Permit, with a valid type test report. ST processes a complete new CoA application within five working days. Our ST approval guide covers test reports, documents and fees.
  4. Import with the CoA. Under the Customs (Prohibition of Imports) Order 2023 (Fourth Schedule, Part II), domestic electrical apparatus listed there may only be imported with a certificate of approval or a letter of exemption issued by ST for Peninsular Malaysia and Sabah, or by the equivalent authority in Sarawak. Keep the brand and model on your invoice and packing list identical to the CoA.
  5. Test each batch after customs clearance. Importers apply for a SIRIM consignment test on e-cee.sirim.my, or put the product under the SIRIM Product Certification Scheme (PCS).
  6. Label, then sell. Every unit needs the ST-SIRIM label, plus the Energy Efficiency label for products under the Minimum Energy Performance Standards. According to ST, unapproved equipment will be seized, and on conviction the penalty is a fine of up to RM5,000, imprisonment of up to one year, or both.
  7. Keep everything current. Renew each CoA every 12 months on e-Permit and your CoR in e-DIK before it expires.

ST Release Letter: importing without a CoA in special cases

Key Takeaway

An ST Release Letter (RL) is not the normal customs release for approved products. It is ST’s blanket exemption from the CoA for specific purposes. You apply on e-Permit (not e-DIK), there is no fee, and each letter is valid only for that letter or application.

ST lists these Release Letter purposes for regulated equipment:

  • Specific purpose: for example oil rigs, tankers, SIRIM or laboratory testing, electric fence energisers, DC electric vehicle chargers (Mode 4), cruise ships and yachts
  • Concerts
  • Factory research and quality research
  • Re-work and re-export
  • Imported components for equipment manufactured for 100% export or for the local market
  • Transit through a bonded customs warehouse, with 100% re-export

For equipment that is not regulated, ST can issue a notification letter for customs purposes. Equipment brought in only for an exhibition needs a CoA for Display instead (RM30 processing fee plus a RM220 display fee). It may not be sold, installed or used, and must be re-exported or returned after the exhibition.

Shipment already at the port? What to check first

SHIPMENT AT THE PORT?

Goods at Port Klang, Penang or KLIA without the right ST documents?

Send us your Bill of Lading or Air Waybill, commercial invoice, packing list and any CoR or CoA you already have. We’ll first check and review your documents and tell you what is missing.

Work through these questions in order:

  1. Is the product regulated? Check it against ST’s 34 categories and the Fourth Schedule of the Customs (Prohibition of Imports) Order 2023.
  2. Does the importer named on the shipping documents hold a valid CoR?
  3. Is there a valid CoA for the exact equipment name, brand and model? Small differences between the invoice, the label and the CoA cause problems.
  4. Does a Release Letter purpose apply? Transit, re-export, research or a specific purpose such as laboratory testing.
  5. Is the SIRIM consignment test planned for after customs clearance, so the goods can be labelled and sold?

ST’s approval guidelines don’t describe any emergency or provisional clearance route, so be careful with anyone who promises one. Equipment that fails the SIRIM consignment test can be ordered back to the country of origin or destroyed.

Common reasons e-DIK and ST applications are rejected or stuck

  • Missing CoR documents. No tenancy agreement for rented premises, no local authority business licence, or premises photos without the signboard. ST rejects the application with a remark until you provide them.
  • The confirmation email was never clicked. The application doesn’t reach ST until you click the Pengesahan link.
  • Late CoR renewal. Renewals received less than 14 days before expiry are automatically rejected, and you must apply for a new CoR.
  • Applying for a CoA without a valid CoR. The registration must be valid before the CoA application.
  • Wrong product details on the CoA application. If the equipment name, brand or model is incorrect, ST rejects the application.
  • Test report problems. The report is more than five years old, has less than 12 months of validity left, or doesn’t cover Malaysia’s supply (230 V single-phase or 400 V three-phase, 50 Hz).
  • Wrong mains plug. Malaysia accepts a 13 A fused plug to MS 589-1 or BS 1363-1, a 15 A plug to MS 1577, or a 2.5 A flat two-pole plug for Class II equipment to MS 1578 or BS EN 50075. Class 0 and Class 01 appliances are not allowed.
  • Unwanted models left in e-Permit when renewing a CoA. ST rejects the renewal.

e-DIK, CoA, SIRIM consignment and PCS: how they fit together

ItemCoversWhereWhen
Certificate of Registration (CoR)Your company, as importer or manufacturere-DIKFirst. Valid one to five years
Certificate of Approval (CoA)Each product: name, brand and modele-PermitBefore you import or manufacture. Valid 12 months, renewable
SIRIM consignment testEach imported batche-cee.sirim.myAfter customs clearance, before the ST-SIRIM label and sale
SIRIM PCSProduct certification by SIRIMSIRIMRequired for local manufacturers. Importers can use it instead of consignment testing
Release LetterCoA exemption for specific purposese-PermitBefore import. Valid per letter or application

Why work with Mindvox on e-DIK and ST approval

  • One team for the whole chain: e-DIK registration and renewal, the e-Permit CoA application, SIRIM consignment testing or PCS, and CoA renewals, handled end to end.
  • No Malaysian company? No problem. For overseas brands, Mindvox can act as your Malaysian importer and CoR holder, so you can import and sell without setting up a local entity first.
  • We check before we submit: CoR documents, test reports, plugs and model names, so the application goes in right the first time.
  • A clear timeline: typically 4–6 weeks after complete documents, including CoR registration. Lab testing, if needed, is extra.
  • More than electrical products: we also handle MCMC, SPAN, SIRIM and JKR approvals. See our compliance services.
  • A Malaysian company you can visit, founded in 2009: MINDVOX SDN BHD, 9-3, Jalan 6/18a, Taman Mastiara, 51200 Kuala Lumpur. We are a member of MEADA (Malaysian Electrical Appliances Distributors Association).
  • Talk to a person: WhatsApp +6012-294 2213, phone 03-6242 4858 or email sales@mindvox.com.my.

Related compliance guides

Frequently Asked Questions (FAQ)

Is this the official e-DIK portal?

No. The official e-DIK portal is edik.st.gov.my, run by Suruhanjaya Tenaga (the Energy Commission). Existing users log in there, and new users click Pendaftaran Baru. Mindvox (MINDVOX SDN BHD) is a private compliance firm that helps importers and manufacturers register on e-DIK and get ST approval.

What is the e-DIK system used for?

e-DIK is ST’s online system for registering as an importer or manufacturer of regulated electrical equipment and getting a Certificate of Registration (CoR). It is also used to update, renew and print the CoR, register Conformity Assessment Bodies and generate QR codes for the Energy Efficiency label. Product approval (the CoA) is applied for separately on e-Permit.

How do I register a new account on e-DIK?

On edik.st.gov.my, click Pendaftaran Baru, create your user ID and choose the Certificate of Registration to Manufacture / Import. Fill in the company, warehouse and applicant tabs, upload your documents, tick Setuju and click Hantar. Then click the Pengesahan link in the confirmation email. The application only reaches ST after that.

What documents do I need for an ST Certificate of Registration?

Your SSM business, company or LLP profile; a warehouse tenancy agreement if the premises are rented; a business licence from the local authority; photos of the business premises and warehouse showing the signboard; and any other document ST asks for. There is no fee for the CoR.

How long does an e-DIK registration take, and how long is the CoR valid?

ST processes a complete CoR application within five working days. The CoR is valid for one to five years, depending on the period you apply for. Renew it in e-DIK from two months before expiry and no later than 14 days before; renewals received later are rejected and you must apply for a new CoR.

Can a foreign company register on e-DIK?

The CoR is issued to Malaysian importers and manufacturers, and the documents are Malaysian ones: an SSM profile, a local authority business licence and photos of local premises. ST says applicants from abroad can apply for a CoA only if they hold a CoR. Overseas brands therefore work through a Malaysian company. Mindvox can act as your Malaysian importer and CoR holder.

Apa itu sistem e-DIK Suruhanjaya Tenaga?

e-DIK ialah sistem dalam talian Suruhanjaya Tenaga di edik.st.gov.my untuk mendaftar sebagai pengimport atau pengilang kelengkapan elektrik dan mendapatkan Perakuan Pendaftaran (CoR). Selepas CoR diluluskan, Perakuan Kelulusan (CoA) bagi setiap produk dimohon melalui sistem e-Permit DagangNet.

Need help with e-DIK or your ST approval?

Send us your company details, product list and test reports. We’ll tell you what’s missing and when you can expect your CoR and CoA, typically 4–6 weeks after complete documents.

Get e-DIK & ST Approval Help